-
BRL 5219 declared in force
31 August 2023
Per 1 September 2023 the new version of BRL5219 has been declared in force and published. Read more about the parts the BRL 5219 have been updated.
-
BRL K17105 published binding
4 May 2023
With effect from April 21, 2023, an amendment sheet to BRL K17105 “Plastic polyethylene pipe systems for the transport of drinking water and raw water” has been released.
-
Design K538 published for comments
2 May 2023
A new Amendment Sheet has been prepared for Guideline K538. Interested parties are invited to submit comments on this Amendment Sheet paper, read more.
-
Draft BRL K17202, parts 1 and 2 published for comments
1 March 2023
The new draft-evaluation guideline BRL K17202, parts 1 and 2 for the renovation of drinking water piping systems with cured-in-place pipe technology (on-site impregnated liner systems) has been published for comments.
-
Draft BRL K17201, parts 1 and 2 published for comments
1 March 2023
The revised draft-evaluation guideline BRL K17201, parts 1 and 2 for the renovation of drinking water piping systems with cured-in-place pipe technology (factory impregnated liner systems) has been published for comments.
-
BRL K535 published for comments
3 February 2023
Kiwa publishes the Concept BRL K535, Evaluation Guideline for the Kiwa product certificate for lubricants for rubber seals, dated 01-02-2023 for corrections and comments.
-
BRL 5219 published for comments
4 January 2023
The revised draft-assessment directive BRL 5219 (KOMO) for plastics piping systems intended for closed geothermal energy systems has been published for comments.